Progress ·
Digging the lake
A dredge works the lake at the heart of the park while the loop road around it is cut through the pines.

The middle of Palm City Industrial Park is a lake, dug from the old sand pit. In March 2025 a dredge was working the open water while the shoreline was shaped into coves and points.
Around the outside, a loop road has been graded through the pines in white base rock, with silt fence along the edge of the woods to keep runoff out of the preserve beyond.
The lodge is planned for this park, though its parcel is not settled yet. The first job is the ground every building on the park will stand on.