Progress ·
A year on: the road is in
A paved road now runs in from the front of the park, past the businesses already working here, to a cul-de-sac by the lake.

A year after the last flight, the park has a road. It runs in from the front of the park past the businesses already working here, with curbs and grassed swales on both sides, and ends in a cul-de-sac beside the lake.
Around it the ground is cleared and graded into lots, and the lake has taken its final outline. The dredge is still out on the water, working the far end.

Next on the park: the storage yard at Palm City Yards on the lots along SW Poma Drive. The lodge follows once its parcel and permits are settled; we will post here as that moves.